Bathroom Renovation
January 25 to March 18, 2010
The 2nd floor bathroom was renovated by Robert Messick Construction.
Thu, Mar 18 The invoice came and was paid. The project is completed.
Wed, Mar 17 The towel bars have been installed and tightened. We're waiting for an invoice.
Tue, Mar 16 The shower door installer were here at 0700. The sink was more firmly attached and Tom took the first shower. Towel bars will be installed tomorrow.
Mon, Mar 15 The faucet on the sink was corrected. The shower doors should be installed tomorrow morning.
Fri, Mar 12 Polliard Plumbing finished the plumbing portion of the bathroom, including the installation of the sink.
Wed, Mar 10 The bathroom window was tinted.
Tue, Mar 9 Greg reports the window tinting will be completed tomorrow.
Thu, Mar 4 The grouting was finished.
Wed, Mar 3 The tile installers added some foundation for the glass doors.
Mon, Mar 1 Measurements were taken for the glass doors.
Fri, Feb 26 The tile installers finished the tile and grouting today. With the bench coming all the way out to the edge of the tiled area, we're not sure how the doors are going to work.
Thu, Feb 25 At 1400, the tile installers returned to continue tiling. They'll complete the grouting tomorrow.
Wed, Feb 24 By 0830, the guys were back at work in the bathroom. They tiled about halfway up the wall and need tiles to go around the window.
Tue, Feb 23 They continued work on the bench. Since it's wet, they'll return tomorrow and continue sealing and tiling.
Mon, Feb 22 No work was scheduled for the weekend. Monday, they started the building of the bench.
Fri, Feb 19 The pan that makes up the floor of the shower was installed.
Thu, Feb 18 The sub-floor, under the shower floor, was rebuilt.
Wed, Feb 17 Polliard Plumbing rebuilt the plumbing in the walls and moved the drain to the center of the shower.
Tue, Feb 16 The old tub, floor and wall tile were removed. The old vanity is gone.
Fri, Feb 5 The Messick brothers brought the craftsman who will build the pan to the house for measurements and arrangements.
Wed, Feb 3 We went to Custom Tile and matched the old tile. They'll secure enough to finish the job.
Tue, Feb 2 We talked to Greg on the phone and agreed to his proposal. Tomorrow we're going to Custom Tile to pick out tile and fixtures.
Mon, Feb 1 An email from Greg contains drawings and proposals.
Wed, Jan 27 Jack, from Polliard Plumbing, took measurements for their portion of the job.
Mon, Jan 25 Greg, from Messick Construction, discussed the project and took measurements.
Fri, Jan 22 A phone call to Polliard Plumbing requests a referral to a contractor.