PROJECT 4
11/11/11
We're calling our latest project with the Messick Brothers, Project 4 (1:Bathroom, 2:Kitchen, 3:Porch). This project has 5 parts:
  1. Put a light under the top shelf of the bar, similar to lights under the kitchen cabinets. 12/17: Completed

  2. Mirror the back wall of the bar. 12/17: Completed

  3. Build a shelf unit to go between the family room desk and the kitchen wall. 12/20: Completed

  4. Move the irrigation timer from the location chosen by Bryan to a location chosen by us. 12/20: Completed

  5. Put a vertical pantry between the refrigerator and the bathroom wall. 12/20: Completed

Wed, Dec 22 The project is finished and ready for billing.
Mon, Dec 20 The Messick brother’s carpenters installed the vertical pantry next to the fridge. The shot on the left is the area before the installation.
Christine painted the new shelf which is next to the desk.
Dicky moved the irrigation timer into the laundry room.
Sat, Dec 18 Alex delivered the pantry. It will be installed Monday.
We stuck the box behind the sofa.
Fri, Dec 17 Robbie and Ricky were here at 7. Robbie put in the light in the bar and Ricky built the shelf unit to go next to the desk. Donnie brought the mirror and it’s been installed in the bar. Kitchen Design will deliver the pantry cabinet tomorrow.
The light and the mirror look good.
The base(L) and the completed unit(R).
Thu, Dec 16 Robbie Messick called and the kitchen cabinet should be delivered here tomorrow for installation. He and his crew will be here around 0700.
Tue, Nov 30 Rob and Don measured for the bar mirror.
Sun, Nov 28 We decided we want to change the doors in the family room. This will be Project #5.
Mon, Nov 22 Greg says the cabinet is expected the week of 12/13 and they'll be finished before the holidays.
Tue, Nov 9 We signed the contracts. Though it calls for a deposit, Greg told us not to bother with it.
Mon, Nov 8 We wrote to Greg and went back to the original plan; Erica's desk is too expensive.
Fri, Nov 5 Greg sent us drawings from Erica and a new, rather high, estimate including a replacement desk.
Thu, Oct 28 Greg spoke with Erica, she is putting together options for the desk area. ED supply has a 30” (4 bulb-18 watt each) Xeon under cabinet light in Bronze. With a high-low dimmer/on and off switch to one side. This light will come with a plug-in for the outlet.
Tue, Oct 26 Dickey came and checked the location of the irrigation timer and the bar and said he can do both jobs.
Wed, Oct 20 Erica, of Kitchen Design, measured for the pantry and had suggestions for the shelf unit.
Tue, Oct 19 Greg sent us an estimate for the project. Dicky needs to add his estimate and Erica needs to come and measure.
Wed, Oct 13 Greg came and learned what we want. He'll develop a proposal